subject
Mathematics, 26.03.2021 20:10 mandyt6058

Two girder designs are under consideration for a bridge for a 1,200-foot crossing. The first design is expected to result in a superstructure weight per foot of 22(S) + 800, where S is the span between piers. The second design should result in superstructure weight per foot of 20(S) + 1,000. Piers and two required abutments are estimated to cost $220,000 each. Let X = the number of piers plus abutments. The superstructure will be erected at a cost of $0.55 per pound. Choose the girder design that will result in a minimum cost and specify the optimum value for X. Hint: X must be an integer.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Neveah and clint are baking muffins for the bake sale. they need to bake 30 muffins for their display case. clint has baked 4 so far, and neveah has baked 7. how many muffins (m) do they have left to bake? show your work!
Answers: 1
question
Mathematics, 21.06.2019 15:30
Find the slope of the line below . enter your answer as a fraction or decimal. use a slash mark ( / ) as the fraction bar if necessary
Answers: 3
question
Mathematics, 21.06.2019 16:00
Enter the number of complex zeros for the polynomial function in the box. f(x) = x+ + 5x² +6
Answers: 2
question
Mathematics, 21.06.2019 20:00
The weight v of an object on venus varies directly with its weight e on earth. a person weighing 120 lb on earth would weigh 106 lb on venus. how much would a person weighing 150 lb on earth weigh on venus?
Answers: 1
You know the right answer?
Two girder designs are under consideration for a bridge for a 1,200-foot crossing. The first design...
Questions
question
Chemistry, 18.11.2020 23:40
question
Social Studies, 18.11.2020 23:40
question
Mathematics, 18.11.2020 23:40
question
Mathematics, 18.11.2020 23:40
Questions on the website: 13722367