subject
Mathematics, 30.03.2021 18:30 Destine1965

it takes 8 builders 12 days to build a wall .How long will it take for 4 builders to build the same wall ?​

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The school that imani goes to is selling tickets to the annual dance competition. on the first day of the ticket sales the school sold 7 adult tickets and 5 child tickets for a total of $96. the school took in $40 on the second day by seling 3 adult tickets . find the price of an adult ticket and the price of a child ticket. solve by using substitution elimination college prep algebra math heres the 2 equations i came up with 7x+5y=96 and 3x+2y= -40 show all workiv be stuck on this.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Hardest math question of all time can you solve the equation. check for extraneous solutions.9∣9-8x∣ = 2x+3
Answers: 2
question
Mathematics, 21.06.2019 23:30
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
question
Mathematics, 22.06.2019 01:00
On friday, there were x students at the baseball game. on monday, there were half as many students at the game as there were on friday. on wednesday, there were 32 fewer students at the game as there were on friday. which expression could represent the total number of tickets sold for all 3 games?
Answers: 2
You know the right answer?
it takes 8 builders 12 days to build a wall .How long will it take for 4 builders to build the same...
Questions
Questions on the website: 13722363