Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.

Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Left over=1700ft after 5 months of digging

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Enter the missing numbers in the boxes to complete the table of equivalent ratios of lengths to widths. ? 18 8 ? 10 30 12 ?
Answers: 3
question
Mathematics, 21.06.2019 19:30
Bob is putting books on a shelf and takes a break after filling 18 1/2 inches on the book shelf. the book shelf is now 2/3 full. how long is the entire bookshelf?
Answers: 2
question
Mathematics, 21.06.2019 20:00
How many sides does a regular polygon have if each exterior angle measure is 45 degrees explain your answer, i really don't understand this.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Look at triangle wxy what is the length (in centimeters) of the side wy of the triangle?
Answers: 2
You know the right answer?
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Questions
question
History, 14.04.2020 20:07
Questions on the website: 13722367