subject
Mathematics, 08.04.2021 08:30 kiararoman1715

Steel Company manufactures two kinds of wrought-iron rails: Model E (the elegant) and Model D (the distinctive). Model E rails sell for $59 and cost $50 to make, whereas Model
D rails sell for $48 and cost $41 to make. To make one Model E rail requires 2 hours on
Machine A, 1 hour on Machine B, and 4 hours on Machine C. On the other hand, to make
one Model D rail requires 1 hour on A, 2 hours on B, and 5 hours on C. Production
scheduling indicates that during the coming week Machine A will be available for at most
30 hours, Machine B for at most 24 hours, and Machine C for at most 72 hours. Find the
number of each kind of rail to be made in the coming week in order for the company to
maximize its profit. Calculate the maximum profit.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Which of the following answers is 7/9 simplified? 7/9 2/9 11/9 2/7
Answers: 2
question
Mathematics, 21.06.2019 19:00
You are at a restaurant and owe $38 for your meal. you want to leave a 20% tip. how much will your tip be?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Solve the problem by making up an equation. a man could arrive on time for an appointment if he drove the car at 40 mph; however, since he left the house 15 minutes late, he drove the car at 50 mph and arrive 3 minutes early for the appointment. how far from his house was his appointment?
Answers: 1
question
Mathematics, 22.06.2019 01:00
The measures of the angles in △abc are given by the expressions in the table. angle measure angle a 65° angle b (3x−10)° angle c (2x)∘ find the value of x. then find the m∠b and m∠c.
Answers: 1
You know the right answer?
Steel Company manufactures two kinds of wrought-iron rails: Model E (the elegant) and Model D (the...
Questions
question
Mathematics, 19.11.2020 21:00
question
Social Studies, 19.11.2020 21:00
question
Mathematics, 19.11.2020 21:00
question
Mathematics, 19.11.2020 21:00
Questions on the website: 13722367