subject
Mathematics, 12.04.2021 21:30 paco38

The measures of accuracy of the forecasts . predict the future values and wait for a predefined time period to examine how accurate the predictions were check to see if the forecast error is negative check how well a particular forecasting method is able to reproduce the time series data that are already available use the current value to estimate how well the model generates previous values correctly

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
David must install fencing around a lot that is shaped like a right angle.the side of lot that runs east-west is 200 ft long.the side of the lot runs north-south is 125 ft long.calculate how many feet of fencing he will need to surround the entire lot.
Answers: 2
question
Mathematics, 21.06.2019 15:50
3-12. write each answer with a reasonable number of figures. find the absolute uncertainty and percent relative uncertainty for each answer. (a) [12.41 (±0.09) + 4.16 (±0.01)] x 7.068 2 (±0.000 4) =? (b) [3.26 (±0.10) x 8.47 (±0.05)] - 0.18 (±0.06) =? (c) 6.843 (±0.008) x 104 + [2.09 (±0.04)- 1.63 (±0.01)] =?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Mama mia restaurant used 1 2 2 1 ? of their mozzarella cheese making pizza and the remaining 6 4 64 ounces making pasta. how many pounds of mozzarella cheese did mama mia start with?
Answers: 1
question
Mathematics, 21.06.2019 23:40
What is the slope of (0,32) and (100,212)
Answers: 2
You know the right answer?
The measures of accuracy of the forecasts . predict the future values and wait for a predefined time...
Questions
question
Mathematics, 09.04.2021 19:10
question
Mathematics, 09.04.2021 19:10
Questions on the website: 13722361