subject
Mathematics, 16.04.2021 06:50 micahwilkerson8344

Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 52 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates that it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final finishing operation. Thus, Cabinetmaker 1 can only complete 40/47 = 0.85, or 85%, of the oak cabinets if it worked only on oak cabinets. Similarly, Cabinetmaker 1 can only complete 40/64 = 0.63, or 63%, of the cherry cabinets if it worked only on cherry cabinets.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Perform the required operations on the following functions given: f(x)= 3-x; g(x)= -2x find g[f(x)]
Answers: 3
question
Mathematics, 21.06.2019 17:00
Tim's phone service charges $23.06 plus an additional $0.22 for each text message sent per month. if tim's phone bill was $28.56, which equation could be used to find how many text messages, x, tim sent last month?
Answers: 2
question
Mathematics, 21.06.2019 19:30
Kyle and elijah are planning a road trip to california. their car travels 3/4 of a mile per min if they did not stop driving, how many miles could kyle and elijah drive in a whole day? ? 1 day = 24 hours. plzzz i will give you 100 points
Answers: 2
question
Mathematics, 21.06.2019 22:50
Ur environment is very sensitive to the amount of ozone in the upper atmosphere. the level of ozone normally found is 4.04.0 parts/million (ppm). a researcher believes that the current ozone level is not at a normal level. the mean of 2525 samples is 4.44.4 ppm with a standard deviation of 0.80.8. assume the population is normally distributed. a level of significance of 0.020.02 will be used. make the decision to reject or fail to reject the null hypothesis. answer tables
Answers: 3
You know the right answer?
Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southea...
Questions
question
Computers and Technology, 04.06.2020 01:58
question
Mathematics, 04.06.2020 01:58
question
Biology, 04.06.2020 01:58
question
Arts, 04.06.2020 01:58
question
Mathematics, 04.06.2020 01:58
Questions on the website: 13722367