subject
Mathematics, 16.04.2021 20:50 sairaanwar67

Two processes in a manufacturing line are performed manually: operation A and operation B. A random sample of 50 different assemblies using operation A shows that the sample average time per assembly is 8.05 minutes, with a population standard deviation of 1.36 minutes. A random sample of 38 different assemblies using operation B shows that the sample average time per assembly is 7.26 minutes, with a population standard deviation of 1.06 minutes. Required:
For α = 0.10, is there enough evidence in these samples to declare that operation A takes significantly longer to perform than operation B?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
How do you solve a question like this?
Answers: 2
question
Mathematics, 21.06.2019 18:00
Jacob signs up to work for 2 1/2 hours at the school carnival. if each work shift is 3/4 hour, how many shifts will jacob work? (i just want to double check : |, for anybody that responds! : )
Answers: 3
question
Mathematics, 21.06.2019 19:30
Consider that lines b and c are parallel. what is the value of x? what is the measure of the smaller angle?
Answers: 1
question
Mathematics, 21.06.2019 19:50
Examine the two-step equation. − 7 4 + x 4 = 2 which property of operations allows you to add the same constant term to both sides? amultiplication property of equality bdivision property of equality caddition property of equality dsubtraction property of equality
Answers: 2
You know the right answer?
Two processes in a manufacturing line are performed manually: operation A and operation B. A random...
Questions
question
Mathematics, 16.12.2020 23:20
question
Mathematics, 16.12.2020 23:20
question
Mathematics, 16.12.2020 23:20
question
Mathematics, 16.12.2020 23:20
Questions on the website: 13722363