subject
Mathematics, 06.12.2019 15:31 cheychey021203

Aconstruction company spends ww weeks extending an existing road. the existing road is 7 miles long. each week the company completes 0.5 miles of the extension. which equation models the total length, ll , of the road over time? a l=0.5w+7l=0.5w+7 b l=0.5w−7l=0.5w-7 c w=0.5l+7w=0.5l+7 d w=0.5l−

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
What is the area of mnp? 40 m2 60 m2 68 m2 127.5 m2
Answers: 2
question
Mathematics, 21.06.2019 18:30
Kayla wants to find the width, ab, of a river. she walks along the edge of the river 65 ft and marks point c. then she walks 25 ft further and marks point d. she turns 90° and walks until her location, point a, and point c are collinear. she marks point e at this location, as shown. (a) can kayla conclude that δ and δ are similar? why or why not? (b) suppose de = 15 ft. what can kayla conclude about the width of the river?
Answers: 2
question
Mathematics, 21.06.2019 21:30
A(1,1) b(-3,0) c(-4,-1) d(3,-2) drag it to correct position
Answers: 2
question
Mathematics, 22.06.2019 01:30
Jacob is graphing the line represented by the equation  −6x−5y=12.−6x−5y=12.  he first plots the  x-x-  and  y-interceptsy-intercepts  as follows.    which statement is correct regarding the intercepts on the graph?
Answers: 1
You know the right answer?
Aconstruction company spends ww weeks extending an existing road. the existing road is 7 miles long....
Questions
question
Mathematics, 05.10.2020 03:01
question
Mathematics, 05.10.2020 03:01
question
Mathematics, 05.10.2020 03:01
question
Chemistry, 05.10.2020 03:01
question
Mathematics, 05.10.2020 03:01
question
Mathematics, 05.10.2020 03:01
question
Mathematics, 05.10.2020 03:01
Questions on the website: 13722367