subject
Mathematics, 04.02.2020 18:58 dudedan05

William, a logistician, needs to route a freight train that is 20 feet at its tallest point and 10 feet at its widest point within 3 days. the most direct path includes a single-track tunnel that needs 24 hour notice prior to use. if the tunnel is roughly modeled by f(x)=-0.x^2+3.2x-3.5, should william make arrangements for the train to use the tunnel?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
100 points, hi, i’m not sure what to do here,the data doesn’t seem to be quadratic .? can anyone me, in advance
Answers: 2
question
Mathematics, 21.06.2019 18:00
Find the number of real number solutions for the equation. x2 + 5x + 7 = 0 0 cannot be determined 1 2
Answers: 2
question
Mathematics, 21.06.2019 19:00
Through non-collinear points there is exactly one plane.
Answers: 1
question
Mathematics, 21.06.2019 23:20
The following hormone had their receptors in the cell membrane except a-insulin b-tsh c-gh d- cortisol
Answers: 2
You know the right answer?
William, a logistician, needs to route a freight train that is 20 feet at its tallest point and 10 f...
Questions
question
Advanced Placement (AP), 10.02.2021 01:30
question
Biology, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
question
Mathematics, 10.02.2021 01:30
Questions on the website: 13722367