subject
Mathematics, 03.02.2020 17:03 briannmalcolmp3l4pz

If it takes 4 men 6 hours to repair a road, how long will it take 7 men to do the job if they work at the same rate ?

a)
2 5/7 hours

b)
3 2/7 hours

c)
3 3/7 hours

d)
3 5/7 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:50
Adriana sold 50 shares of a company’s stock through a broker. the price per share on that day was $22.98. the broker charged her a 0.75% commission. what was adriana’s real return after deducting the broker’s commission? a. $8.62 b. $229.80 c. $1,140.38 d. $1,149.00
Answers: 1
question
Mathematics, 21.06.2019 19:00
The fence around a quadrilateral-shaped pasture is 3a^2+15a+9 long. three sides of the fence have the following lengths: 5a, 10a-2, a^2-7. what is the length of the fourth side of the fence?
Answers: 1
question
Mathematics, 21.06.2019 19:10
Can some one me with these questions
Answers: 2
question
Mathematics, 21.06.2019 20:10
Right triangle xyz has a right angle at vertex y and a hypotenuse that measures 24 cm. angle zxy measures 70º. what is the length of line segment xy? round to the nearest tenth. 8.2 cm 8.7 cm 22.6 m 25.5 cm
Answers: 1
You know the right answer?
If it takes 4 men 6 hours to repair a road, how long will it take 7 men to do the job if they work a...
Questions
question
Mathematics, 02.07.2019 02:30
question
Biology, 02.07.2019 02:30
question
History, 02.07.2019 02:30
Questions on the website: 13722367