subject
Mathematics, 22.11.2019 12:31 naomicervero

Abuilding company completes 42 homes every 2 months. at this rate, how many homes can the company complete in 6 months?

a: 63
b: 126
c: 252
d: 504

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Arecipe uses 2 cups of sugar to make 32 brownies. how many cups of sugar are needed to make 72 brownies?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Use the formulas a = x 2 – y 2, b = 2xy, c = x 2 + y 2 to answer this question. one leg of a right triangle has length 11 and all sides are whole numbers. find the lengths of the other two sides. the other leg = a0 and the hypotenuse = a1
Answers: 2
question
Mathematics, 21.06.2019 21:30
Aroulette wheel has 38 slots in which the ball can land. two of the slots are green, 18 are red, and 18 are black. the ball is equally likely to land in any slot. the roulette wheel is going to be spun twice, and the outcomes of the two spins are independent.the probability that it lands one time on red and another time on black in any order is(a) 0.5 (b) 0.25 (c) 0.4488 (d) 0.2244
Answers: 1
question
Mathematics, 22.06.2019 01:00
Michael split a rope that was 28 inches long into 5 equal parts. brenden split a rope that was 30 inches long into 6 equal parts. which boy's rope was cut into longer pieces?
Answers: 1
You know the right answer?
Abuilding company completes 42 homes every 2 months. at this rate, how many homes can the company co...
Questions
Questions on the website: 13722360