subject
Mathematics, 03.02.2020 05:53 misslux

Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to build and 4 hours to test. each adult bike requires 6 hours to build and 4 hours to test. with the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. if c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 10 child bikes and 12 adult bikes in the week.

a: no, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
b: no, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100
c: yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
d: yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Weekly wages at a certain factory are normally distributed with a mean of $400 and a standard deviation of $50. find the probability that a worker selected at random makes between $450 and $500
Answers: 2
question
Mathematics, 21.06.2019 21:20
If f(x) = 4 - x2 and g(x) = 6x, which expression is equivalent to (g-f)(3)? 06-3-(4 + 3)2 06-3-(4-33 6(3) - 4 +32 6(3) -4 -32
Answers: 1
question
Mathematics, 21.06.2019 23:30
Which of the following vectors are orthogonal to (2,1)? check all that apply
Answers: 1
question
Mathematics, 22.06.2019 00:00
(20 points) a bank has been receiving complaints from real estate agents that their customers have been waiting too long for mortgage confirmations. the bank prides itself on its mortgage application process and decides to investigate the claims. the bank manager takes a random sample of 20 customers whose mortgage applications have been processed in the last 6 months and finds the following wait times (in days): 5, 7, 22, 4, 12, 9, 9, 14, 3, 6, 5, 15, 10, 17, 12, 10, 9, 4, 10, 13 assume that the random variable x measures the number of days a customer waits for mortgage processing at this bank, and assume that x is normally distributed. 2a. find the sample mean of this data (x ě…). 2b. find the sample variance of x. find the variance of x ě…. for (c), (d), and (e), use the appropriate t-distribution 2c. find the 90% confidence interval for the population mean (îľ). 2d. test the hypothesis that îľ is equal to 7 at the 95% confidence level. (should you do a one-tailed or two-tailed test here? ) 2e. what is the approximate p-value of this hypothesis?
Answers: 2
You know the right answer?
Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to...
Questions
Questions on the website: 13722363