subject
Mathematics, 09.11.2019 21:31 elianagilbert3p3hh63

Pentru efectuarea unei lucrari,10 muncitori lucreaza 4ore.
a. in cate ore vor termina lucrarea 4 muncitori?
b. de cati muncitori este nevoie pentru a termina in 8 ore?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Angela is buying a dress that is on sale for 20% off. if the original price of the dress is $40.00, how much money is angela saving on the dress? a. $0.80 b. $3.20 c. $32.00 d. $8.00
Answers: 1
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a. the median of max’s data is 250 b. more than half of the data points max recorded were 177 centimeters. c. a data point chosen at random is as likely to be above the mean as it is to be below the mean. d. every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
question
Mathematics, 21.06.2019 22:00
Which is the correct first step in finding the area of the base of a cylinder with a volume of 26x cubic meters and a height of 6.5 meters? v=bh 6.5=b(26x) v=bh v=26pi+(6.5) v=bh v=26pi(6.5) v=bh 26pi=b(6.5)
Answers: 1
question
Mathematics, 21.06.2019 23:40
When steve woke up. his temperature was 102 degrees f. two hours later it was 3 degrees lower. what was his temperature then?
Answers: 1
You know the right answer?
Pentru efectuarea unei lucrari,10 muncitori lucreaza 4ore.
a. in cate ore vor termina lucrarea...
Questions
question
Mathematics, 11.05.2021 22:30
question
Mathematics, 11.05.2021 22:30
question
Biology, 11.05.2021 22:30
Questions on the website: 13722361