Abuilding contractor is to dig a foundation 54 feet long, 12 feet wide, and 6 feet deep. the contractor pays $25 per load for trucks to remove the dirt. each truck holds 9 cubic yards. what is the cost to the contractor to have all the dirt hauled away?

(17 points for you ^-^)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Find percent notation for 0.008 0.008=
Answers: 2
question
Mathematics, 21.06.2019 18:30
Sketch one cycle if the cosine function y=2cos2theta
Answers: 1
question
Mathematics, 21.06.2019 20:00
15 and 14.7 are 1 apart, so 15 – 14.7 must be 1.
Answers: 1
question
Mathematics, 22.06.2019 01:00
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter?
Answers: 1
You know the right answer?
Abuilding contractor is to dig a foundation 54 feet long, 12 feet wide, and 6 feet deep. the contrac...
Questions
question
Mathematics, 30.10.2021 18:40
question
Mathematics, 30.10.2021 18:40
question
English, 30.10.2021 18:40
question
Spanish, 30.10.2021 18:40
question
Mathematics, 30.10.2021 18:40
Questions on the website: 13722362