subject
Mathematics, 23.09.2019 10:30 QueenNerdy889

During 2013, tanner manufacturing expected job no. 26 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. tanner applied overhead based on direct labor cost. actual production required an overhead cost of $280,000, $550,000 in materials used, and $210,000 in labor. all of the goods were completed. what amount was transferred to finished goods?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
Which expression gives the area of the triangle shown below
Answers: 1
question
Mathematics, 21.06.2019 16:50
The parabola y = x² - 4 opens: a.) up b.) down c.) right d.) left
Answers: 1
question
Mathematics, 21.06.2019 21:30
A.s.a.! similarity in right triangles, refer to the figure to complete this proportionc/a = a/? a.) cb.) hc.) rd.) s
Answers: 1
question
Mathematics, 21.06.2019 22:00
The mean finish time was 185.52 with a standard deviation of 0.327 minute. the winning car driven by chris finished in 185.13. the previous year race had a mean finish time of 110.3 with a standard deviation of 0.106. the winning car that year driven by karen finished in 110.13 minutes. find their respective z-scores. chris - z-score karen “- z-score
Answers: 1
You know the right answer?
During 2013, tanner manufacturing expected job no. 26 to cost $300,000 of overhead, $500,000 of mate...
Questions
question
Mathematics, 23.07.2019 19:30
Questions on the website: 13722367