subject
Mathematics, 28.01.2020 12:31 deena7

8builders completed the construction of a wall with a length of 15 meters and a height of 3 meters in 7 days and 7 hours, how many days needed for 4 builders to build the same wall

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
Determine whether the points (–3,–6) and (2,–8) are in the solution set of the system of inequalities below. x ? –3 y < 5? 3x + 2 a. the point (–3,–6) is not in the solution set, and the point (2,–8) is in the solution set. b. neither of the points is in the solution set. c. the point (–3,–6) is in the solution set, and the point (2,–8) is not in the solution set. d. both points are in the solution set.
Answers: 3
question
Mathematics, 21.06.2019 20:00
Will possibly give brainliest and a high rating. choose the linear inequality that describes the graph. the gray area represents the shaded region. 4x + y > 4 4x – y ≥ 4 4x + y < 4 4x + y ≥ 4
Answers: 1
question
Mathematics, 21.06.2019 21:00
Describe how making an ‘and’ compound sentence effects your solution set
Answers: 1
question
Mathematics, 21.06.2019 22:30
Awindow washer cleans 42 windows in 2 hours. at this rate, how many windows did he clean in 180 minutes.
Answers: 2
You know the right answer?
8builders completed the construction of a wall with a length of 15 meters and a height of 3 meters i...
Questions
question
Social Studies, 16.07.2019 16:50
Questions on the website: 13722363