subject
Mathematics, 02.09.2019 13:20 davidgarcia522083

Coolwindows corp. produces 2,000 air conditioners per week in three plants: plant i, plant ii, and plant iii. plant i produces 800 air conditioners per week, plant ii produces 500 air conditioners per week, and plant iii produces 700 air conditioners per week. the probability of an air conditioner being defective is 7% for plant i, 5% for plant ii, and 6% for plant iii, respectively. in a random check, a defective air conditioner is found. what is the probability that the air conditioner was produced in plant ii

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Which is the product of 58 and 1,000? a. 0.058 b. 5,800 c. 58,000 d. 580,000
Answers: 1
question
Mathematics, 22.06.2019 00:30
If the perimeter of the square equals the perimeter of the regular pentagon. each side of a pentagon is 16cm long. how long is each side of the square?
Answers: 3
question
Mathematics, 22.06.2019 03:20
The equation ip| = 2 represents the total number of points that can be earned or lost during one turn of a game. which best describes how many points can be earned or lost during one turn?
Answers: 1
question
Mathematics, 22.06.2019 03:30
Arectangular lawn is 65 m long and 34 m wide. over time, people have walked along a diagonal as a shortcut and have created a straight path. what is the length of the path, to the nearest tenth of a meter? enter your answer as a deicmal in the box. m
Answers: 2
You know the right answer?
Coolwindows corp. produces 2,000 air conditioners per week in three plants: plant i, plant ii, and...
Questions
question
Biology, 18.10.2020 06:01
question
Mathematics, 18.10.2020 06:01
Questions on the website: 13722363