During a tunnel construction project, engineers used explosives to excavate partway into a mountain. because of time constraints and environmental concerns, they later used a tunnel boring machine (tbm) to excavate the rest of the tunnel. the table shows the length of the completed tunnel, y, after different numbers of days, x, since the tbm started working. number of days length of tunnel (feet) 0 225 5 350 20 725 30 975 55 1,600 the length of the completed tunnel can be calculated using the equation . if the project will be completed 86 days after the tbm was introduced, the length of the completed tunnel will be feet.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
15 points ! ~ see if you know the answer to both you!
Answers: 1
question
Mathematics, 21.06.2019 17:40
Which number produces a rationale number when multiplied by 1/5
Answers: 1
question
Mathematics, 21.06.2019 18:20
The total cost of anja’s trip to the dentist was $628.35. she paid a flat fee of $89.95 which included the checkup and cleaning and then had 4 cavities filled, each of which cost the same amount. which shows the correct equation and value of x, the cost of each cavity filling?
Answers: 2
question
Mathematics, 21.06.2019 20:00
If the sales price of a dvd is $20 and the markup is 34%, what is the cost of the dvd?
Answers: 1
You know the right answer?
During a tunnel construction project, engineers used explosives to excavate partway into a mountain....
Questions
question
Law, 20.03.2021 23:50
question
Mathematics, 20.03.2021 23:50
question
Mathematics, 20.03.2021 23:50
question
Mathematics, 20.03.2021 23:50
question
Mathematics, 20.03.2021 23:50
question
English, 20.03.2021 23:50
Questions on the website: 13722367