a samall assembly line for the assembly of power steering pumps needs to be balanced. shown below is the precedence diagram. the cycle time is determined to be 1.5 minutes . how whuld the line be balanced by choosing the assignable task having the longest task time first?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Acompany produces packets of soap powder labeled “giant size 32 ounces.” the actual weight of soap powder in such a box has a normal distribution with a mean of 33 oz and a standard deviation of 0.7 oz. to avoid having dissatisfied customers, the company says a box of soap is considered underweight if it weighs less than 32 oz. to avoid losing money, it labels the top 5% (the heaviest 5%) overweight. how heavy does a box have to be for it to be labeled overweight?
Answers: 3
question
Mathematics, 21.06.2019 23:00
The measurement of one angle of a right triangle is 42° what is the measurement of the third angle? (there is no picture)
Answers: 1
question
Mathematics, 22.06.2019 00:00
What is mean median mode and range?
Answers: 2
question
Mathematics, 22.06.2019 00:00
Technicians have installed a center pivot, circular irrigator for a farm that covers 25 acres. a.) how long is the irrigation boom (in feet) from the center pivot to its farthest extent? b.) if the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 5 days?
Answers: 1
You know the right answer?
a samall assembly line for the assembly of power steering pumps needs to be balanced. shown below is...
Questions
question
Mathematics, 05.03.2021 08:40
question
Mathematics, 05.03.2021 08:50
question
Computers and Technology, 05.03.2021 08:50
question
History, 05.03.2021 08:50
question
Health, 05.03.2021 08:50
question
Computers and Technology, 05.03.2021 08:50
question
Chemistry, 05.03.2021 08:50
Questions on the website: 13722363