A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices and the requirements of the project, the bid from Contractor A can be described with a uniform distribution between $600,000 and $800,000, while the bid from Contractor B can be described with a normal distribution with a mean of $700,000 and standard deviation of $50,000. If the building contractor submits a bid of $750,000, what is the probability that the building contractor will obtain the bid

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Which graph represents the equation y =4x
Answers: 2
question
Mathematics, 21.06.2019 20:20
The surface area of the triangular prism is .
Answers: 1
question
Mathematics, 21.06.2019 21:30
How do your peer relationships affect your overall health status? what can you do to improve your peer relationships?
Answers: 1
question
Mathematics, 21.06.2019 22:30
One number is 4 less than 3 times a second number. if 3 more than two times the first number is decreased by 2 times the second number, the result is 11. use the substitution method. what is the first number?
Answers: 1
You know the right answer?
A building contractor is preparing a bid on a new construction project. Two other contractors will b...
Questions
question
Mathematics, 13.11.2020 16:50
question
Mathematics, 13.11.2020 16:50
question
Mathematics, 13.11.2020 16:50
question
History, 13.11.2020 16:50
Questions on the website: 13722367