subject
Mathematics, 01.05.2021 01:00 kaitlynauito75

Suppose that two projects A and B have a 0.7% chance of a loss of $ 8 million, a 2.3% chance of a loss of $1 million, and a 97% chance of a profit of $1 million. The losses on these two investments are distributed independently of each other. Required:
a. What is the VaR for one of the investments when the confidence level is 99%?
b. What is the expected shortfall (ES) for one of the investments when the confidence level is 99%?
c. Show the probability distribution of losses/profits for a portfolio consisting of both investments. You need to determine all possible losses/gains on this portfolio and calculate corresponding probabilities.
d. What is the VaR when of the portfolio consisting of both investments when the confidence level is 99%?
e. What is the expected shortfall to a portfolio consisting of the two investments when the confidence level is 99%?
f. Based on your findings, what is your conclusion about the shortcoming of VaR as opposed to using ES?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
What 2 forces allow things to fall ‍♀️‍♀️
Answers: 1
question
Mathematics, 21.06.2019 22:00
Arefrigeration system at your company uses temperature sensors fixed to read celsius (°c) values, but the system operators in your control room understand only the fahrenheit scale. you have been asked to make a fahrenheit (°f) label for the high temperature alarm, which is set to ring whenever the system temperature rises above –10°c. what fahrenheit value should you write on the label?
Answers: 3
question
Mathematics, 21.06.2019 22:00
If rs 900 amounts to rs 1044 in 4 years, what sum will amount to 1368 in 3 1/2 years at the same rate
Answers: 3
question
Mathematics, 22.06.2019 02:30
Which problem would you use the following proportion to solve for? 24/x=40/100 a. what is 40% of 24? b. what percent is 24 of 40? c. twenty-four is 40% of what number? d. forty percent of 24 is what number?
Answers: 3
You know the right answer?
Suppose that two projects A and B have a 0.7% chance of a loss of $ 8 million, a 2.3% chance of a lo...
Questions
question
Mathematics, 17.01.2021 16:20
question
English, 17.01.2021 16:20
question
Mathematics, 17.01.2021 16:20
question
English, 17.01.2021 16:20
question
Mathematics, 17.01.2021 16:20
Questions on the website: 13722367