subject
Mathematics, 03.05.2021 15:30 geezelouise808

If an Automobile Service Repair Shop, that operates for eight (8) hours per day, has a total of seven (7) workstations available, and the average automobile repair job takes two (2) hours to complete, what is their daily Service Capacity (i. e., how many cars/customers can this service operation accommodate per eight (8) hour day)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Amir wants to proportionally increase the size of a photo to create a poster for his room. the size of the original photo is shown. complete the statement and then answer the question to represent ways that amir can increase the size of his photo.
Answers: 2
question
Mathematics, 21.06.2019 23:00
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
question
Mathematics, 22.06.2019 00:00
This circle is centered at the origin, and the length of its radius is 6. what is the circle's equation? a. x^2+y^2=36 b x^2+y^2=6 c x+y=36 d x^6+y^6=1
Answers: 2
question
Mathematics, 22.06.2019 01:00
Libby built a fence that was 56 \text { feet}56 feet long over 44 days. she built the same length of fence each day. how many inches of fence did libby build each day?
Answers: 1
You know the right answer?
If an Automobile Service Repair Shop, that operates for eight (8) hours per day, has a total of seve...
Questions
question
Mathematics, 11.02.2021 18:40
question
Mathematics, 11.02.2021 18:40
Questions on the website: 13722361