Mathematics, 06.05.2021 18:00 dajmoneyp80a0o
Suppose that an operator at work stations completed 980 assemblies over a four shift time period. Actual working times averaged 7 hours per shift. Random observations of this operation indicated that this operator was working on component A 40% of the time, component B 25% of the time, and component C the remainder. What is the normal time required for each component's assembly based upon these observations