subject
Mathematics, 06.05.2021 19:00 sullivanjakob

How do you work this out If it takes 6 workers 10 days to
complete a project how long would
it take 4 workers?​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Monica build a remote control toy airplane for science project to test the plane she launched it from the top of a building the plane travel a horizontal distance of 50 feet before landing on the ground a quadratic function which models the height of the plane in feet relative to the ground at a horizontal distance of x feet from the building is shown
Answers: 1
question
Mathematics, 21.06.2019 20:00
Someone answer asap for ! the boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a. e = 2b - 212 b. b = 2e - 212 c. e = -2b + 212 d. b = -2e + 212
Answers: 1
question
Mathematics, 21.06.2019 20:10
Acolony contains 1500 bacteria. the population increases at a rate of 115% each hour. if x represents the number of hours elapsed, which function represents the scenario? f(x) = 1500(1.15)" f(x) = 1500(115) f(x) = 1500(2.15) f(x) = 1500(215)
Answers: 3
question
Mathematics, 21.06.2019 22:50
Which statement accurately describes how to perform a 90° clockwise rotation of point a (1,4) around the origin?
Answers: 2
You know the right answer?
How do you work this out If it takes 6 workers 10 days to
complete a project how long would
Questions
Questions on the website: 13722359