The following data were obtained in a study taken on a horizontal milling machine: Parts produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured stress time per cycle: 4.62 minutes. Average fast traverse time: 0.08 minutes. Average cutting time with electrical power: 3.66 minutes. Performance rating: 115%. Clearance (machine time): 10%. Slack (effort time): 15%. The operator works on the task 8 hours a day and produces 380 parts. How many standard hours does the operator work

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
What is the volume of a rectangular prism if the length is 10.4 mm the width is 5 mm in the height is 8 mm
Answers: 1
question
Mathematics, 21.06.2019 15:20
If x=-3 is the only x-intercept of the graph of a quadratic equation, which statement best discribes the discriminant of the equation?
Answers: 1
question
Mathematics, 21.06.2019 16:50
Rockwell hardness of pins of a certain type is known to have a mean value of 50 and a standard deviation of 1.1. (round your answers to four decimal places.) (a) if the distribution is normal, what is the probability that the sample mean hardness for a random sample of 8 pins is at least 51?
Answers: 3
question
Mathematics, 21.06.2019 18:30
[10 points, algebra 2-simplifying complex fractions]according to my answer key the restrictions are -1 and 4. but why not positive 1?
Answers: 1
You know the right answer?
The following data were obtained in a study taken on a horizontal milling machine: Parts produced pe...
Questions
question
Spanish, 27.04.2021 18:20
question
Spanish, 27.04.2021 18:20
question
Chemistry, 27.04.2021 18:20
Questions on the website: 13722367