subject
Mathematics, 10.05.2021 20:50 krojas015

Horizontal pieces can be produced at a rate of 200 per labor hour. A carpenter uses 500 horizontal pieces and 22 vertical pieces while making racks for an hour. You have 900 horizontal pieces and 50 vertical pieces in stock right now. For the next hour, you assign Juan to rack making, Debbie to trim making, and both Mike and Stan to horizontal piece production. Please answer the following two questions, based on this information and assuming that nothing would interfere with or otherwise influence the activity described. 1. At the end of the next hour, how many vertical pieces will be available in stock? a) 28 vertical pieces b) 48 vertical pieces c) 78 vertical pieces d) 50 vertical pieces e) 100 vertical pieces
2. At the end of the next hour, how many horizontal pieces will be available in stock? a) 450 horizontal pieces b) 600 horizontal pieces c) 800 horizontal pieces d) 1,150 horizontal pieces e) 1,300 horizontal piec

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Aline has a slope of 1/4 and passes through point (0.4,-1/2). what is the value of the y-intercept?
Answers: 2
question
Mathematics, 21.06.2019 17:40
The graph of h(x)= |x-10| +6 is shown. on which interval is this graph increasing
Answers: 2
question
Mathematics, 21.06.2019 19:00
The weekly revenue for a company is r = 3p^2 + 60p + 1060, where p is the price of the company's product. what price will result in a revenue of $1200.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Acompany produces packets of soap powder labeled “giant size 32 ounces.” the actual weight of soap powder in such a box has a normal distribution with a mean of 33 oz and a standard deviation of 0.7 oz. to avoid having dissatisfied customers, the company says a box of soap is considered underweight if it weighs less than 32 oz. to avoid losing money, it labels the top 5% (the heaviest 5%) overweight. how heavy does a box have to be for it to be labeled overweight?
Answers: 3
You know the right answer?
Horizontal pieces can be produced at a rate of 200 per labor hour. A carpenter uses 500 horizontal p...
Questions
question
English, 30.11.2019 00:31
question
Biology, 30.11.2019 00:31
question
History, 30.11.2019 00:31
Questions on the website: 13722363