Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do process A in 1 minute, B in 2 minutes, and C in 3 minutes. You have two A machines, one B machine, and three C machines. Which process is the
bottleneck (can produce the fewest items per unit time)?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What is the percentile for data value 6 in the following data set? 4 13 8 6 4 4 13 6 4 13 2 13 15 5 9 4 12 8 6 13 40 25 35 62
Answers: 2
question
Mathematics, 22.06.2019 01:00
#7. m is the midpoint of pq, the diameter of the circle o is 13in. and rm = 4in. find pm find pq
Answers: 1
question
Mathematics, 22.06.2019 02:00
The image of abc after a reflection across eg is abc
Answers: 2
question
Mathematics, 22.06.2019 03:40
Abottled water distributor wants to estimate the amount of water contained in 1-gallon bottles purchased from a nationally known water bottling company. the water bottling company’s specifications state that the standard deviation of the amount of water is equal to 0.02 gallon. a random sample of 50 bottles is selected, and the sample mean amount of water per 1-gallon bottle is 0.995 gallon a. construct a 99% confidence interval estimate for the popula-tion mean amount of water included in a 1-gallon bottle. b. on the basis of these results, do you think that the distributor has a right to complain to the water bottling company? why? c. must you assume that the population amount of water per bottle is normally distributed here? explain. d. construct a 95% confidence interval estimate. how does this change your answer to (b)?
Answers: 2
You know the right answer?
Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do p...
Questions
question
Chemistry, 12.11.2019 17:31
question
Mathematics, 12.11.2019 17:31
Questions on the website: 13722367