subject
Mathematics, 25.05.2021 06:20 seanisom7

When building a house, the number of days required to build is inversely proportional to with the number of workers. One house was built in 110 days by 8 workers. How many days would it take to build a similar house with 44 workers?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Which of the following is the inverse of y = 3∧x y = 1/3∧x y = ㏒3x y = (1/3) ∧x y = ㏒ 1/3∧x
Answers: 1
question
Mathematics, 21.06.2019 21:30
Write 5(6x+4)-2(5x-2) in the form a(bx+c) where a,b and c integers and a> 1
Answers: 2
question
Mathematics, 21.06.2019 22:10
Gravel is being dumped from a conveyor belt at a rate of 25 ft3/min, and its coarseness is such that it forms a pile in the shape of a cone whose base diameter and height are always equal. how fast is the height of the pile increasing when the pile is 14 ft high? (round your answer to two decimal places.) ft/min
Answers: 3
question
Mathematics, 21.06.2019 22:40
(10. in the figure, a aabc is drawn tocircumscribe a circle of radius 3 cm ,such thatthe segments bd and dc are respectively oflength 6 cm and 9 cm. find the length ofsides ab and ac.
Answers: 3
You know the right answer?
When building a house, the number of days required to build is inversely proportional to with the nu...
Questions
question
Social Studies, 13.11.2019 20:31
question
Mathematics, 13.11.2019 20:31
Questions on the website: 13722367