subject
Mathematics, 27.05.2021 20:00 fishesforever2321

Consider the following project network applying PERT/CPM as described, where the number over each through this network from start to finish, since the longest path is node is the time required for the corresponding activity. Consider the problem of finding the longest path (the largest total time) the critical path.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:20
Asap describe the transformations required to obtain the graph of the function f(x) from the graph of the function g(x). f(x)=-5.8sin x. g(x)=sin x. a: vertical stretch by a factor of 5.8, reflection across y-axis. b: vertical stretch by a factor of 5.8,reflection across x-axis. c: horizontal stretch by a factor of 5.8, reflection across x-axis. d: horizontal stretch by a factor of 5.8 reflection across y-axis.
Answers: 1
question
Mathematics, 21.06.2019 18:30
It says factor each expression completely 8y+48
Answers: 1
question
Mathematics, 21.06.2019 19:00
What are the solutions of the system? solve by graphing. y = -x^2 -6x - 7 y = 2
Answers: 2
question
Mathematics, 21.06.2019 19:00
Solve 3x-18=2y and 5x-6y=6 by elimination show work
Answers: 2
You know the right answer?
Consider the following project network applying PERT/CPM as described, where the number over each th...
Questions
Questions on the website: 13722367