A project has the following activities and related data: Activity. Time (Weeks) Immediate Activity Predecessor Crash Most Most Most Cost Maximum Optimistic likely Pessimistic ($000) Crashable (a) (m) (C) per weeks week A None 1 3 11 3 1 00 None 4 5 6 4 1 С А 5 6 7 1 2 D А 4 5 12 1 2 1 E B 6 11 2 1 B 1 2 15 F 1 3 2 4 6 6 G CD 2 3 4 2 1 2 H EF G CD 2 4 6 6 N H EF 2 3 3 4 4 2 1 34a. (20 points) a. Compute the expected value E(t) and variance V(t) for all activities
Activity A B C D E F G H
E(t) weeks
V(t) weeks^2
b. there are three critical paths ACG, ADG, and BEH, all with expected project completion time time E(t) = 14 weeks. Compute the variance of project completion time for each path
V(ACG)=
V(ADG)=
V(BEH)
c. Assume that the project completion time T is normally distributed with mean E(T)=14 weeks and variance V(T) approximately by the maximum of the variances of the three individual critical paths. Determine the time X in weeks for which there is a 40% probability that the project can be completed on or before x.
d. List all alternatives and the respective costs for shortening the project by one week and identify the best alternative that has the minimum costs. Hint there are 8 alternatives
Alternative cost
the best alternative is..
e. For activity i, let Xi be the earliest finishing time and Yi be the number of weeks shortened. Formulate the linear program for minimizing the cost for shortening the project by one week

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Suzanne began a trip with 18 1/2 gallons of gas in the gas tank of her car if she hughes 17 3/4 gallons on the trip how many gallons does she have left once she finish the trip
Answers: 1
question
Mathematics, 21.06.2019 21:00
Which expressions are equivalent to -7+3(-4e-3)? choose all answers that apply: choose all answers that apply: a -4(3e+4)? 4(3e+4) b 12e12e c none of the above
Answers: 2
question
Mathematics, 22.06.2019 00:00
Find the length of the normal and the angle it makes with the positive x-axis. (see pictured below)
Answers: 1
question
Mathematics, 22.06.2019 00:00
Jessica is organizing a guided tour of the rain forest. the average profit per person that the touring company makes is given by the rational expression 18x+35/x, where x is the number of people going on the tour. what does the numerator of this rational expression represents?
Answers: 2
You know the right answer?
A project has the following activities and related data: Activity. Time (Weeks) Immediate Activity P...
Questions
question
Mathematics, 19.01.2020 14:31
question
Mathematics, 19.01.2020 14:31
question
Mathematics, 19.01.2020 14:31
Questions on the website: 13722367