subject
Mathematics, 03.06.2021 06:30 luna563

A contractor has two choices for billing a completed job. · $500 flat rate, regardless of the number of hours worked
· $20 per hour worked
The graph shows the relationship between pay per hour and number of hours worked for both scenarios.

What is the solution to this system of equations, and what does it mean to the contractor?
The solution (0, 20) tells the contractor the minimum amount that can be charged.
The solution (0, 500) tells the contractor the maximum amount that can be charged.
The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
The solution (20, 25) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Thelime contains the point(-3,0) and parallel x-3y=3( show all work)
Answers: 3
question
Mathematics, 21.06.2019 22:20
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
question
Mathematics, 21.06.2019 23:00
In an equilateral triangle, each angle is represented by 5y+3. what is the value of y? a. 9.7 b. 10.8 c. 11.4 d. 7.2
Answers: 1
question
Mathematics, 22.06.2019 00:00
Parallelogram efgh is a rectangle. he = 6, and fe = 8. find ge: and find fj:
Answers: 1
You know the right answer?
A contractor has two choices for billing a completed job. · $500 flat rate, regardless of the numbe...
Questions
question
Social Studies, 03.04.2021 18:40
question
Mathematics, 03.04.2021 18:40
question
Mathematics, 03.04.2021 18:40
question
Mathematics, 03.04.2021 18:40
Questions on the website: 13722363