A building contractor is to dig a foundation 48 feet​ long 15 feet​ wide, and 6feet deep. The contractor pays ​$20 per load for trucks to remove the dirt. Each truck holds 8 cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Determine which postulate or theorem can be used to prove that lmn =nmo
Answers: 3
question
Mathematics, 22.06.2019 06:00
Ijump serves waffles, pancakes or french toast for breakfast. in addition, there are 14 syrups from which to choose. the meal comes with the choice of chocolate chips, strawberries or no topping. how many different breakfasts are possible at ijump?
Answers: 3
question
Mathematics, 22.06.2019 06:30
The circulation of a newsletter decreased from 5300 to 3630 find the precentage
Answers: 1
question
Mathematics, 22.06.2019 07:50
What measure of axb is 196. what is the measure of abc the tangent-chord angle
Answers: 3
You know the right answer?
A building contractor is to dig a foundation 48 feet​ long 15 feet​ wide, and 6feet deep. The contra...
Questions
question
History, 21.12.2020 21:30
question
Mathematics, 21.12.2020 21:30
question
Mathematics, 21.12.2020 21:30
Questions on the website: 13722367