subject
Mathematics, 03.06.2021 15:30 nell1234565

A construction crew is using heavy equipment to dig a hole in which the foundation of a house will be built. The hole will be in the shape of a right rectangular prism with dimensions of 4 feet in depth, 100 feet long, and 50 feet wide.
The soil will be removed using a truck that can hold a maximum of 40,000 pounds. The soil weighs 90 pounds per
cubic foot. What is the least number of truckloads needed to remove all of the soil?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:40
Which of the following would be a good name for the function that takes the weight of a box and returns the energy needed to lift it?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Aflower has 26 chromosomes. to create a new flower, how many chromosomes would a sperm cell have? what is this process called? part 2: within a flower cell that has 26 chromosomes, how many chromosomes would a cell that is created within the stem of a flower as it grows, have? what is this process called?
Answers: 1
question
Mathematics, 21.06.2019 21:00
Tessa bought stock in a restaurant for $253.00. her stock is now worth $333.96. what is the percentage increase of the value of tessa's stock? a.) 81% b.) 32% c.) 24% d.) 76%
Answers: 1
question
Mathematics, 21.06.2019 22:00
What is the graph of the function fx x+2/x-3?
Answers: 3
You know the right answer?
A construction crew is using heavy equipment to dig a hole in which the foundation of a house will b...
Questions
question
Mathematics, 09.02.2022 22:00
question
Mathematics, 09.02.2022 22:00
question
Mathematics, 09.02.2022 22:00
question
Mathematics, 09.02.2022 22:00
Questions on the website: 13722361