subject
Mathematics, 05.06.2021 08:00 tanviknawale

Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch with 100 pieces has a M. A.D of (0.20) Which batch has less variability and what does it mean for the production engineer's? M. A.D(Mean Absolute Deviation) ​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Terri makes a quilt using three sizes of fabric squares the side lenght of each fabric square is the square root of the area
Answers: 2
question
Mathematics, 21.06.2019 18:30
Complex numbers multiply √-4 * √-25 and show all intermediate steps. alternative notation is sqrt(-4) * sqrt(-25).
Answers: 1
question
Mathematics, 21.06.2019 19:30
According to the data set, where should the upper quartile line of the box plot be placed?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Two line segments are shown in the figure below. suppose that the length of the line along the x-axis is 6, and the length of the hypotenuse of the triangle is 10. what is the equation of the hypotenuse line (shown in red, below)?
Answers: 3
You know the right answer?
Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch...
Questions
question
Mathematics, 19.08.2019 21:30
question
Social Studies, 19.08.2019 21:30
question
History, 19.08.2019 21:30
Questions on the website: 13722362