Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:50
Astudent draws two parabolas both parabolas cross the x axis at (-4,0) and (6,0) the y intercept of the first parabolas is (0,-12). the y intercept of the second parabola is (0,-24) what is the positive difference between the a values for the two functions that describe the parabolas
Answers: 3
Mathematics, 22.06.2019 01:30
If a sprinkler waters 1 over 12 of a lawn in 1 over 2 hour, how much time will it take to water the entire lawn? (5 points) 10 hours 6 hours 1 over 6 hour 7 over 12 hour
Answers: 1
What percent of l0.2 gram of 32 mg...
World Languages, 14.10.2019 02:30
History, 14.10.2019 02:30
History, 14.10.2019 02:30
English, 14.10.2019 02:30
Physics, 14.10.2019 02:30
English, 14.10.2019 02:30
Mathematics, 14.10.2019 02:30
Chemistry, 14.10.2019 02:30
History, 14.10.2019 02:30
World Languages, 14.10.2019 02:30