subject
Mathematics, 17.06.2021 06:10 BigDough9090

Si tres pintores demoran 12 días en hacer un trabajo ¿cuantos pintores se necesitan para hacer el mismo trabajado en 3 días?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:20
Which linear inequality is represented by the graph? !
Answers: 2
question
Mathematics, 21.06.2019 18:00
Jacob signs up to work for 2 1/2 hours at the school carnival. if each work shift is 3/4 hour, how many shifts will jacob work? (i just want to double check : |, for anybody that responds! : )
Answers: 3
question
Mathematics, 21.06.2019 20:30
The difference between two numbers is one. three times the larger number minus two times the smaller number is 9. what are the two numbers
Answers: 3
question
Mathematics, 21.06.2019 22:30
Consider an example of a deck of 52 cards: example set of 52 playing cards: 13 of each suit clubs, diamonds, hearts, and spades ace 2 3 4 5 6 7 8 9 10 jack queen king clubs diamonds hearts spades what is the probability of drawing three queens from a standard deck of cards, given that the first card drawn was a queen? assume that the cards are not replaced.
Answers: 1
You know the right answer?
Si tres pintores demoran 12 días en hacer un trabajo ¿cuantos pintores se necesitan para hacer el mi...
Questions
question
Mathematics, 18.09.2019 21:00
question
Mathematics, 18.09.2019 21:00
question
Mathematics, 18.09.2019 21:00
Questions on the website: 13722363