subject
Mathematics, 20.06.2021 20:10 Haleysaraya1

M. P. VanOyen Manufacturing has gone out on bid for a regulator component. Expected demand is 675 units per month. The item can be purchased from either Allen Manufacturing or Baker Manufacturing. Their price lists are shown in the table. Ordering cost is ​$45​, and annual holding cost per unit is ​$5. Allen Mfg. Baker Mfg. Quantity Unit Price Quantity Unit Price ​1-499 ​$16.00 ​1-399 ​$16.10 ​500-999 15.50 ​400-799 15.60 ​1000+ 15.00 ​800+ 15.10 ​a) What is the economic order quantity if price is not a​ consideration?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Iq scores for adults age 20 to 34 years are normally distributed according to n(120, 20). in what range does the middle 68% of people in this group score on the test?
Answers: 1
question
Mathematics, 21.06.2019 17:40
Aperpendicular bisector, cd is drawn through point con ab if the coordinates of point a are (-3, 2) and the coordinates of point b are (7,6), the x-intercept of cd is point lies on cd.
Answers: 2
question
Mathematics, 21.06.2019 18:00
The chs baseball team was on the field and the batter popped the ball up. the equation b(t)=80t-16•16+3.5 represents the height of the ball above the ground in feet as a function of time in seconds. how long will the catcher have to get in position to catch the ball before it hits the ground? round to the nearest second
Answers: 3
question
Mathematics, 21.06.2019 18:30
Over the last 8 nights, elyse earned the following in tips: {105, 120, 84, 95, 100, 132, 140}. if she earns $140 a night for the next four nights, which measure of center would increase more, the mean or median?
Answers: 3
You know the right answer?
M. P. VanOyen Manufacturing has gone out on bid for a regulator component. Expected demand is 675 un...
Questions
question
Mathematics, 18.03.2021 02:50
question
Mathematics, 18.03.2021 02:50
question
Mathematics, 18.03.2021 02:50
Questions on the website: 13722363