You work on a concrete crew starting a construction project. Once the pouring begins, it must continue non-stop until it is completed. Your crew will work an 8-hour shift along with two other crews. The total project requires 175,000 yards of concrete. Your supervisor estimates that each crew will pour around 1200 yards per hour. How many consecutive days should you plan to work on this project?A recipe requires 1.5 kilograms of eggs. How much is this in pounds?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 22.06.2019 00:30
I've been working on this for a few days and i just don't understand, it's due in a few hours. you. the direction of a vector is defined as the angle of the vector in relation to a horizontal line. as a standard, this angle is measured counterclockwise from the positive x-axis. the direction or angle of v in the diagram is α. part a: how can you use trigonometric ratios to calculate the direction α of a general vector v = < x, y> similar to the diagram? part b suppose that vector v lies in quadrant ii, quadrant iii, or quadrant iv. how can you use trigonometric ratios to calculate the direction (i.e., angle) of the vector in each of these quadrants with respect to the positive x-axis? the angle between the vector and the positive x-axis will be greater than 90 degrees in each case. part c now try a numerical problem. what is the direction of the vector w = < -1, 6 > ?
Answers: 1
question
Mathematics, 22.06.2019 00:30
What is the geometric mean of 3 and 7? a) square root of 21 b) 2 square root of 6 c) 2 square root of 7 d) 21
Answers: 2
question
Mathematics, 22.06.2019 01:50
One cell phone plan charges $20 per month plus $0.15 per minute used. a second cell phone plan charges $35 per month plus $0.10 per minute used. write and solve an equation to find the number of minutes you must talk to have the same cost for both calling plans.
Answers: 2
question
Mathematics, 22.06.2019 02:00
Aflagpole broke in a storm. 77 7 meters are still sticking straight out of the ground, where it snapped, but the remaining piece has hinged over and touches the ground at a point 2424 24 meters away horizontally
Answers: 1
You know the right answer?
You work on a concrete crew starting a construction project. Once the pouring begins, it must contin...
Questions
question
Mathematics, 14.05.2021 05:50
question
Mathematics, 14.05.2021 05:50
question
Mathematics, 14.05.2021 05:50
Questions on the website: 13722360