subject
Mathematics, 09.07.2021 22:50 monkeypants7

An automobile assembly line operation has a scheduled mean completion time, , of minutes. The standard deviation of completion times is minutes. It is claimed that, under new management, the mean completion time has decreased. To test this claim, a random sample of completion times under new management was taken. The sample had a mean of minutes. Can we support, at the level of significance, the claim that the mean completion time has decreased under new management

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
The random variable x is the number of occurrences of an event over an interval of ten minutes. it can be assumed that the probability of an occurrence is the same in any two-time periods of an equal length. it is known that the mean number of occurrences in ten minutes is 5.3. the appropriate probability distribution for the random variable
Answers: 2
question
Mathematics, 21.06.2019 23:00
Janie has $3. she earns $1.20 for each chore she does and can do fractions of chores. she wants to earn enough money to buy a cd for $13.50.
Answers: 1
question
Mathematics, 21.06.2019 23:00
*segment an is an altitude of right ? abc with a right angle at a. if ab = 2root 5 in and nc = 1 in, find bn, an, ac.
Answers: 3
question
Mathematics, 21.06.2019 23:10
Frank is lending $1,000 to sarah for two years. frank and sarah agree that frank should earn a real return of 4 percent per year. instructions: a. the cpi (times 100) is 100 at the time that frank makes the loan. it is expected to be 113 in one year and 127.7 in two years. what nominal rate of interest should frank charge sarah?
Answers: 3
You know the right answer?
An automobile assembly line operation has a scheduled mean completion time, , of minutes. The standa...
Questions
question
Mathematics, 26.11.2019 11:31
Questions on the website: 13722362