subject
Mathematics, 24.07.2021 22:10 live4dramaoy0yf9

A tailoring business makes 3 meter of material two types of garments A and B Gorment while gorment B requires 22 motres The business uses, not more than 600 metres of material daily in making both garments. It must not be. more than 100 garments of type A and not less than 80 of B each day. write dow the four inequalities from this formation ​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:50
Find the missing variable for a parallelogram: a = latex: 32in^2 32 i n 2 h = b = 6.3 in (1in=2.54cm)
Answers: 2
question
Mathematics, 21.06.2019 20:50
The first side of a triangle measures 5 in less than the second side, the third side is 3 in more than the first side, and the perimeter is 17 in. how long is the third side? if s represents the length of the second side, which of the following represents the length of the third side? s-5 ws-2 s+ 3 next question ask for turn it in
Answers: 1
question
Mathematics, 22.06.2019 00:30
Find the values of the variables and the lengths of the sides of this kite.
Answers: 3
question
Mathematics, 22.06.2019 01:50
Whats the theoretical probability of popping a polka dot balloon? express your answer as a fraction, decimal and percent solid 15 polka dot 5 striped 17 plzz me due tomorrow
Answers: 2
You know the right answer?
A tailoring business makes 3 meter of material two types of garments A and B Gorment while gorment B...
Questions
question
English, 04.04.2020 17:02
question
English, 04.04.2020 17:02
question
Mathematics, 04.04.2020 17:04
question
English, 04.04.2020 17:04
Questions on the website: 13722367