subject
Mathematics, 30.07.2021 04:20 dondre54

Sherry is a production manager for a small manufacturing shop and is interested in developing a predictive model to estimate the time to produce an order of a given size—that is, the total time to produce a certain quantity of the product. Suppose she has collected data in the following table on the total time (in minutes) to produce 30 different orders of various quantities. Quantity Total Time (minutes)
105 172
125 189
135 221
141 323
149 248
171 317
190 372
204 185

Required:
a. Develop the estimated regression equation. (Let x = quantity, and let y = total time (in minutes). Round your numerical values to four decimal places.) ŷ =
b. Find the value of the test statistic (round to two decimal places). Find the p-value (round to three decimal places).

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Alawn mower manufacturer incurs a total of 34,816 in overhead costs and 388 per lawn mower in production costs. how many lawn mowers were manufactured if the average cost of productions is 660
Answers: 3
question
Mathematics, 21.06.2019 17:00
According to modern science, earth is about 4.5 billion years old and written human history extends back about 10,000 years. suppose the entire history of earth is represented with a 10-meter-long timeline, with the birth of earth on one end and today at the other end.
Answers: 2
question
Mathematics, 21.06.2019 17:30
Which are factor pairs of 350? choose all answers that are correct. a) 30 and 12 b) 35 and 10 c) 70 and 5 d) 2 and 125
Answers: 2
question
Mathematics, 21.06.2019 18:20
If f(x)=-x^2+6x-1 and g(x)=3x^2-4x-1,find(f+g)(x)
Answers: 1
You know the right answer?
Sherry is a production manager for a small manufacturing shop and is interested in developing a pred...
Questions
Questions on the website: 13722367