Mathematics, 09.08.2021 09:20 phebusadrian01
Invers proportion
it takes 12 workers 3 weeks to complete four project. each project take same numbers of hours
a) at this rate how long would it take fifteen workers to complete ten project? = 6 weeks
b) the ten projects need to be completed in under four weeks. what is the minimum number of workers be needed, given that they all work at the same rate as the original workers ? ( i know answer i need axplaning ) :]
Answers: 2
Mathematics, 21.06.2019 17:00
Which set of reflections would carry trapezoid abcd onto itself? a) x-axis, y=x, y-axis, x-axis b) x-axis, y-axis, x-axis c) y=x, x-axis, x-axis d) y-axis, x-axis, y-axis, x-axis
Answers: 2
Mathematics, 21.06.2019 19:30
Solve the following inequalities and show the solution on a number line. 3/4 (2x-7) ≤ 5
Answers: 1
Mathematics, 21.06.2019 20:00
The multiplicative property of equality states that for real numbers a, b, c, and d, if a = b and c = d, then ac = bd. true false
Answers: 1
Mathematics, 21.06.2019 21:30
Carl's candies has determined that a candy bar measuring 3 inches long has a z-score of +1 and a candy bar measuring 3.75 inches long has a z-score of +2. what is the standard deviation of the length of candy bars produced at carl's candies?
Answers: 1
Invers proportion
it takes 12 workers 3 weeks to complete four project. each project take same numb...
Mathematics, 12.04.2021 18:40
Chemistry, 12.04.2021 18:40
Social Studies, 12.04.2021 18:40
Health, 12.04.2021 18:40
Mathematics, 12.04.2021 18:40
Mathematics, 12.04.2021 18:40
Mathematics, 12.04.2021 18:40
Geography, 12.04.2021 18:40
Physics, 12.04.2021 18:40
Mathematics, 12.04.2021 18:40