subject
Mathematics, 17.08.2021 03:40 adamskhan990

The quality engineer in charge of a salt packaging process is concerned about the moisture content in packages of salt. The primary concern is that variation in the ambient humidity in the plant may be causing variation in the mean moisture content in the packages over time. It is decided that packages in each sample will be produced as close to each other in time as possible. In this way, the ambient humidity will be nearly the same for each package in the sample so that the within-group variation will not be affected by this special cause. Five packages of salt are sampled every 15 minutes for 5 hours and the moisture content in each package is measured as a percentage of total weight. The data is found below. Sample Sample Values
1 2.53 2.66 1.88 2.21 2.26
2 2.69 2.38 2.34 2.47 2.61
3 2.67 2.23 2.10 2.43 2.54
4 2.10 2.26 2.51 2.58 2.28
5 2.64 2.42 2.56 2.51 2.36
6 2.64 1.63 2.95 2.12 2.67
7 2.58 2.69 3.01 3.01 2.23
8 2.31 2.39 2.60 2.40 2.46
9 3.03 2.68 2.27 2.54 2.63
10 2.86 3.22 2.72 3.09 2.48
11 2.71 2.80 3.09 2.60 3.39
12 2.95 3.54 2.59 3.31 2.87
13 3.14 2.84 3.77 2.27 3.22
14 2.85 3.29 3.25 3.35 3.59
15 2.82 3.71 3.36 2.95 3.37
16 3.17 3.07 3.14 3.63 3.70
17 2.81 3.21 2.95 3.04 2.85
18 2.99 2.65 2.79 2.80 2.95
19 3.11 2.74 2.59 3.01 3.03
20 2.83 2.74 3.03 2.68 2.49
The quality engineer is trying to establish the control limits for an X bar and R chart. Using the data, compute the centerline and control limits for an R chart. Plot the points. Is the process in statistical control?
If the chart is out-of-control, assume that the assignable cause is found and corrected. Eliminate the out-of-control point(s), recompute the limits and redraw the R chart. Does the process appear to be in control now? If the chart is in control, skip to part (c).
Compute the centerline and limits for and draw the X bar chart (Note: do not include any eliminated points from part (b)). Does the process mean appear to be in control?
Outline the remaining steps in this process to establish the control limits (do not carry them out).
Assume the process is in control with the following values: For the X bar chart, the centerline = 2.704 with UCL=3.060 and LCL=2.348. For the R chart, the centerline = 0.6164 with UCL = 1.33 and LCL = 0. Estimate the mean and standard deviation for this process.
If the specifications for moisture content are [1.80, 3.70], estimate the fraction nonconforming packages of salt (in ppm).
Estimate Cp and Cpk. Comment on their results.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 22.06.2019 02:00
Which expression is equivalent to (5x^7+7x^8) − (4x^4−2x^8)? a. 9x^8 + 5x^7−4x^4 b. 3x^8 + 7x^7 c. 12x^8 − 2x^4 d. 5x^8 + 5x^7 + 4x^4
Answers: 1
question
Mathematics, 22.06.2019 02:20
Two researchers are attempting to create a new psychotherapy protocol that more reduces panic attacks. they believe that they have succeeded and are now in the clinical trial period of their protocol's development. they are working with several cohort groups, some of which have been through the new protocol, while others have done the standard protocol currently recommended. if these researchers are interested in evaluating the difference in the percentage of test subjects who successfully decreased their panic attacks in 2 months on the new protocol versus the percentage of test subjects who successfully decreased their panic attacks in 2 months with the traditional protocol, which of the following statistical tests would be most appropriate? a. analysis of variance (anova) b. correlation c. chi-square test d. paired t-test e. independent t-test
Answers: 2
question
Mathematics, 22.06.2019 02:30
An ice cream shop sells 5 times as many cakes cones as waffle cones. use x to represent the number of waflle cones the ice cream shop sells and use the variable to write an expresion for the number of cake cones the ice cream shop sells. enter the expression for the number of cake cones the the ice cream shop sells
Answers: 3
question
Mathematics, 22.06.2019 03:50
The sum of the abscissa and the ordinate is six
Answers: 2
You know the right answer?
The quality engineer in charge of a salt packaging process is concerned about the moisture content i...
Questions
question
Mathematics, 28.04.2021 17:00
question
Mathematics, 28.04.2021 17:00
question
Mathematics, 28.04.2021 17:00
question
Mathematics, 28.04.2021 17:00
question
Geography, 28.04.2021 17:00
question
Mathematics, 28.04.2021 17:00
Questions on the website: 13722367