subject
Mathematics, 23.08.2021 19:30 yentel110306

Using the dimensions in the diagram, calculate how much cement is needed to build the monument. 4 m3
7 m3
8 m3
16 m3


Using the dimensions in the diagram, calculate how much cement is needed to build the monument.

4

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
After the seventh month of a 12-month loan: the numerator is: {(n + 11) + (n + 10) + (n + 9) + (n + 8) + (n + 7) + (n + 6) + (n + 5)} = , and the denominator is: {(n) + (n + 1) + + (n + 11)} = . therefore, the fraction is numerator/denominator (to the nearest tenth) = %
Answers: 2
question
Mathematics, 21.06.2019 17:00
The table below shows the height of a ball  x  seconds after being kicked.  what values, rounded to the nearest whole number, complete the quadratic regression equation that models the data? f(x)  =  x2  +  x  +  0based on the regression equation and rounded to the nearest whole number, what is the estimated height after 0.25 seconds?   feet
Answers: 2
question
Mathematics, 21.06.2019 17:00
Tom had a total of $220 and he spent $35 on a basketball ticket . what percent of his money did he have left?
Answers: 1
question
Mathematics, 21.06.2019 22:00
What is the equation of the line that is parallel to the line with the equation y= -3/4x +1 and passes through the point (12,-12)
Answers: 1
You know the right answer?
Using the dimensions in the diagram, calculate how much cement is needed to build the monument. 4...
Questions
question
Mathematics, 03.06.2021 23:50
question
Geography, 03.06.2021 23:50
question
Social Studies, 03.06.2021 23:50
question
English, 03.06.2021 23:50
question
Mathematics, 03.06.2021 23:50
question
Mathematics, 03.06.2021 23:50
Questions on the website: 13722362