subject
Mathematics, 01.09.2021 20:00 princess239

A building contractor is to dig a foundation 42 feet​ long, 21 feet​ wide, and 9 feet deep. The contractor pays ​$10 per load for trucks to remove the dirt. Each truck holds 7 cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
Sara sells beaded necklaces she makes a profit of 4 dollars pn every neclace she sells which table represents the profit sara makes
Answers: 1
question
Mathematics, 21.06.2019 16:30
Iwant to know what 3g+5h+4g-2h is my teacher is too selfish to tell us
Answers: 1
question
Mathematics, 21.06.2019 21:30
If you flip a coin 3 times, what is the probability of flipping heads 3 times? a. p(3 heads) = 3/8 b. p(3 heads) = 1/6 c. p(3 heads) = 1/8 d. p(3 heads) = 1/2
Answers: 2
question
Mathematics, 22.06.2019 00:40
The formula for the volume of a right square pyramid is given below, where a is the side length of the base and h is the height.
Answers: 1
You know the right answer?
A building contractor is to dig a foundation 42 feet​ long, 21 feet​ wide, and 9 feet deep. The cont...
Questions
question
Mathematics, 23.10.2020 18:20
question
Mathematics, 23.10.2020 18:20
Questions on the website: 13722362