How do I find the maximum number of hours that the completion time for a critical activity (float/slack time=0) can be reduced without affecting the critical path of a project?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Every rhombus is a square. true false
Answers: 2
question
Mathematics, 21.06.2019 15:30
Each of the four sides of a swimming pool measures 9 meters. the pool is 5 meters deep. how much water will be needed to fill it completely? a. 45 cubic meters b. 81 cubic meters c. 225 cubic meters d. 405 cubic meters reset next
Answers: 1
question
Mathematics, 21.06.2019 16:00
Graph the equation by plotting point x=2
Answers: 1
question
Mathematics, 21.06.2019 17:40
Follow these steps using the algebra tiles to solve the equation −5x + (−2) = −2x + 4. 1. add 5 positive x-tiles to both sides and create zero pairs. 2. add 4 negative unit tiles to both sides and create zero pairs. 3. divide the unit tiles evenly among the x-tiles. x =
Answers: 1
You know the right answer?
How do I find the maximum number of hours that the completion time for a critical activity (float/sl...
Questions
question
Mathematics, 22.04.2020 15:38
question
Mathematics, 22.04.2020 15:38
question
English, 22.04.2020 15:39
question
Biology, 22.04.2020 15:39
Questions on the website: 13722360