Mathematics, 21.09.2021 18:30 akj2000

Assume that for this project to be completed, six independent tasks must be completed. These tasks are proceeding in parallel by six different subcontractors. To keep it simple, let's assume that each task takes between 3 and 7 months to complete (uniformly distributed, i. e. equally likely to take any amount of time between 3 and 7 months). So, the mean time to complete each task is 5 months and the probability of any given task taking 5 months or longer is 0.5. However, the project is NOT considered complete until ALL six tasks are complete. Conduct an Excel spreadsheet based simulation (As we did for the two dice experiment) with 100 experiments to answer the following questions: Use only RAND function (do not use RANDBETWEEN). Q1: What is the probability that the project finishes in 5 months or less

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
An angle that measures between 90 and 180° is called a(,
Answers: 2
question
Mathematics, 21.06.2019 20:50
What is the 9th term in the geometric sequence described by this explicit formula? an=-6. (2)(n-1) apex
Answers: 2
question
Mathematics, 21.06.2019 21:00
Ineed with math stuff it involves graphs
Answers: 1
question
Mathematics, 21.06.2019 21:50
Aline passes through the point (–7, 5) and has a slope of 1/2 which is another point that the line passes through?
Answers: 3
You know the right answer?
Assume that for this project to be completed, six independent tasks must be completed. These tasks a...
Questions
question
Advanced Placement (AP), 20.09.2020 03:01
question
Mathematics, 20.09.2020 03:01
Questions on the website: 13722367