! Required information
M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost.
Activity Cost Pools
Machining
Setup
Quality control
Estimated
Total Cost Estimated cost Driver
$581,400 19,000 machine hours
95, 175 470 batches
147,200 920 inspections
M4-11 (Algo) Assigning Costs Using Activity Rates (LO 4.4)
Suppose the Speedy boat requires 2,740 machine hours, 100 batches, and 300 inspections. Using the activity rates, determine the
amount of overhead assigned to the Speedy product line. (Round your intermediate calculations to 2 decimal places and your final
answers to the nearest dollar amount.)
Allocated Overhead
Cost Pool
Machining
Setup Costs
Quality Control
Total Overhead
$
0

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Im gonna fail 7th grade selective breeding 1. creates offspring which are genetically identical to the parent 2. is the process of breeding only organisms with desirable traits 3. involves the removal of the nucleus of a cell 4. combines traits from organisms of different species
Answers: 2
question
Mathematics, 21.06.2019 21:00
How do you write y-10=2 (x-8) in standard form
Answers: 1
question
Mathematics, 21.06.2019 21:30
Alcoa was $10.02 a share yesterday. today it is at $9.75 a share. if you own 50 shares, did ou have capital gain or loss ? how much of a gain or loss did you have ? express the capital gain/loss as a percent of the original price
Answers: 2
question
Mathematics, 21.06.2019 21:50
Which of the following equations is equivalent to x/3-6/x=1
Answers: 3
You know the right answer?
! Required information
M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote...
Questions
question
Mathematics, 15.01.2021 21:00
question
Computers and Technology, 15.01.2021 21:00
question
Chemistry, 15.01.2021 21:00
Questions on the website: 13722360