Mathematics, 27.09.2021 14:00 aisha82
3. The Fine Threads Company produces sleeveless and regular t-shirts. It takes 1 hour to produce each sleeveless
t-shirt and 1.5 hours to produce each regular t-shirt. The company has a total of 975 hours of production time
available. Due to demand, the total number of shirts produced in a week should not exceed 800.
a. Would it be feasible for Fine Threads to produce 400 sleeveless and 400 regular t-shirts each week?
Justify your answer.
b. Write an inequality that expresses the constraint on production time.
c. Write an inequality that expresses the constraint on demand for shirts.
Answers: 3
Mathematics, 21.06.2019 19:00
John used linear combination to solve the system of equations shown. he did so by multiplying the first equation by -3 and the second equation by another number to eliminate the x-terms. what number did jonas multiply the second equation by? 4x-6y=23x+5y=11
Answers: 2
Mathematics, 21.06.2019 19:30
Powerful women's group has claimed that men and women differ in attitudes about sexual discrimination. a group of 50 men (group 1) and 40 women (group 2) were asked if they thought sexual discrimination is a problem in the united states. of those sampled, 11 of the men and 19 of the women did believe that sexual discrimination is a problem. if the p-value turns out to be 0.035 (which is not the real value in this data set), then at = 0.05, you should fail to reject h0. at = 0.04, you should reject h0. at = 0.03, you should reject h0. none of these would be a correct statement.
Answers: 2
Mathematics, 21.06.2019 21:00
Asequence has its first term equal to 4, and each term of the sequence is obtained by adding 2 to the previous term. if f(n) represents the nth term of the sequence, which of the following recursive functions best defines this sequence? (1 point) f(1) = 2 and f(n) = f(n − 1) + 4; n > 1 f(1) = 4 and f(n) = f(n − 1) + 2n; n > 1 f(1) = 2 and f(n) = f(n − 1) + 4n; n > 1 f(1) = 4 and f(n) = f(n − 1) + 2; n > 1 i will award !
Answers: 1
3. The Fine Threads Company produces sleeveless and regular t-shirts. It takes 1 hour to produce eac...
Social Studies, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
Computers and Technology, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
History, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
Mathematics, 07.05.2021 21:20
English, 07.05.2021 21:20