subject
Mathematics, 19.10.2021 14:00 muanghoih14

A company has installed a generator to back up the power in case there is a power failure. The probability that there will be a power failure during a snowstorm is 0.11. The probability that the generator will stop working during a snowstorm is 0.019. What is the probability that during a snowstorm the company will lose both sources of power

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Acar travels at an average speed of 52 miles per hour. how long does it take to travel 299 miles
Answers: 1
question
Mathematics, 21.06.2019 17:40
Aperpendicular bisector, cd is drawn through point con ab if the coordinates of point a are (-3, 2) and the coordinates of point b are (7,6), the x-intercept of cd is point lies on cd.
Answers: 2
question
Mathematics, 21.06.2019 18:00
Ling listed all of the factors of a mystery number: 1,2,4,8,16,32 what is the mystery number?
Answers: 2
question
Mathematics, 21.06.2019 19:00
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be bale to prepare using the sauce?
Answers: 3
You know the right answer?
A company has installed a generator to back up the power in case there is a power failure. The proba...
Questions
question
Mathematics, 22.02.2021 01:00
question
Geography, 22.02.2021 01:00
question
History, 22.02.2021 01:00
question
Chemistry, 22.02.2021 01:00
question
Mathematics, 22.02.2021 01:00
question
Spanish, 22.02.2021 01:00
question
Biology, 22.02.2021 01:00
Questions on the website: 13722361